___________________________________________________
fINAL SUBMISSIONS:

Project Report
The report contains all the necessary details of the project such as the introduction, process description, process flow diagram, costing analysis, conclusion and recommendation.

Excel File
The file contains all the calculations made in excel to balance the whole system. This also has the block flow diagram, assumptions used and its proof, costing analysis and the process data sheet.

Personal Design Logbook
Each member has their own personal design log book to note the details that they learned throughout the project. This will also include their manual calculations they have done and the assigned parts that they have covered.
___________________________________________________
others:

Manual Calculation
The calculation of energy balance on all of the units were calculated manually. This includes the major units and the auxiliaries needed for the plant.
Weekly Development
01
-
Here are the following progress for Week 8:
-
Had a meeting to finalize the BFD and energy requirement
-
Had a brief regarding to report format
-
Updated the BFD and adding the suitable auxiliaries and divided the tasks to find and do some research regarding the types of auxiliary
05
-
Here are the following progress for Week 12
-
Started the calculation in excel
-
Had a meeting to discuss about the information of costing analysis
-
Had a meeting to assign the task for costing and search for the related info for it
02
-
Here are the following progress for Week 9:
-
Started the manual calculation​
-
Presented the latest BFD and excel
-
Had a meeting to discuss about the calculation and submitted the manual calculation for main units
-
Finding the Cp value for C10H8, C10H12, and C10H18, in solid, liquid, and vapor phase
06
-
Here are the following progress for Week 13
-
Put the table for costing and some information related
-
discuss the content of the report and provide some iDEC link
-
Finalizing the costing analysis
03
-
Here are the following progress for Week 10
-
Updated the pressure and temperature for auxiliary in the excel
-
continuation of the manual calculation and submitted in google drive
04
-
Here are the following progress for Week 11
-
synchronized the updated BFD
07
-
Here are the following progress for Week 14
-
Finalize the excel calculation, had a meeting to discuss the flow of presentation and the assigned roles
-
Start the report per assigned task, and recheck the manual calculation of every unit
-
Finalize the TDP (website) and PDL
-
Finalize the Excel